NEWS |
|
 |
|
OUR LAST PROJECT |
Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010) Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page. |
 |
|
|
NEWS |
Ankara --Keçiören Ankara meets with a unique ropeway sight. All the tower works of the Ankara detachable gondola project, which was finished in June, takes attention with its giant towers. You can find the technical features of the ropeways system, which will be delivered in November , in our reference section.
Added Date : 08.11.2007,Sat-15:55:46 |
| Others News |
» Erzincan Ergan Dağı Telesiyej Tesisi 1. ve 2. Etap (2010) 07.23.2010,Fri-10:53:15 » Aydın-Grup Gondol 03.16.2009,Mon-21:00:01 » İzmit-Kartepe Ski Center 06.26.2008,Thu-12:06:33 » Ankara --Keçiören 08.11.2007,Sat-15:55:46 » Azerbaycan - Balaken 08.11.2007,Sat-15:11:09 » Ankara - Keçiören Tower Montage 05.29.2007,Tue-09:08:06 » Ankara - Keçiören 05.29.2007,Tue-09:12:32 » Ankara – Keçiören 03.02.2007,Fri-12:00:39 » Isparta – Davraz Ski Center 05.28.2007,Mon-13:53:01 » Bitlis – Tatvan 03.02.2007,Fri-13:42:01
|
|
|