NEWS |
|
 |
|
OUR LAST PROJECT |
Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010) Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page. |
 |
|
|
PRODUCTS & SERVICES / Ropeway Systems / Skilift |
Surface Lifts are also in the wide range of STM products with its low-cost. To reach 2.0 m/sec and carry 1400 people in one hour with these systems (Baby – lift / Beginner Lift or T-bar) is possible.With these system it pulls the passengers (skiers) uphill while they slide across the ground. Because of its low construction period and costs, this system is the first choice of the ski centers. |
| Images [Total : 5 ] |
|
|
|