NEWS |
|
 |
|
OUR LAST PROJECT |
Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010) Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page. |
 |
|
|
PRODUCTS & SERVICES / Ropeway Systems / Detachable Chairlift |
The passing system makes it possible, to slow down the speed in the stations to take the passenger with the carrier chair at a certain point and accelerate the speed to 5 m/sec on the line.With these systems that are designed for ski-centers, the capacity can reach 4000 p/h. STM detachable grip that provides high speed on the line can be adoptable to 2 / 4 / 8 person chairs. With the wind protector on the chairs the passengers can be easily and safely transported even at high speeds.
|
| Images [Total : 3 ] |
|
|
|