NEWS |
|
 |
|
OUR LAST PROJECT |
Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010) Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page. |
 |
|
|
PRODUCTS & SERVICES / Ropeway Systems / Group Gondola |
In these systems the passengers can either sit or stand during the travel. With 4 / 6 / 12 person modern gondolas, with Group Gondolas. That’s why the gondolas decelerate and stop in the stations and then accelerate on the line again.
|
| Images [Total : 6 ] |
|
|
|