NEWS |
|
 |
|
OUR LAST PROJECT |
Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010) Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page. |
 |
|
|
REFERENCES |
|
|
|