Main Page | Human Resources | Site Map | E-Mail
NEWS
Erzincan Ergan Dağı Telesiyej Tesisi 1. ve 2. Etap (2010)
Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page.
07.23.2010,Fri-10:53:15

Aydın-Grup Gondol
The new Group Gondola system of Aydın, which was built according to international standards, is since February 2009 open to public. You can get technical information and new pictures of the system from our references page.
03.16.2009,Mon-21:00:01

İzmit-Kartepe Ski Center
The ski-lift,which will serve from 2008 Winter Season in Kartepe Ski Center is delivered to the authorities in June, 2008.
06.26.2008,Thu-12:06:33

Ankara --Keçiören
Ankara meets with a unique ropeway sight. All the tower works of the Ankara detachable gondola project, which was finished in June, takes attention with its giant towers. You can find the technical features of the ropeways system, which will be delivered in November , in our reference section.
08.11.2007,Sat-15:55:46

Azerbaycan - Balaken
On June 11, 2007 the Group Gondola project in Balaken was finished and handed over to the Azerbaijan authorities.You can find the technical data over the first aerial ropeway system about Azerbaijan in our reference section.
08.11.2007,Sat-15:11:09

OUR LAST PROJECT
Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010)
Erzincan Ergan Mountain Chairlift Project have attained by STM SİSTEM TELEFERİK. Totaly 5.100 meters, as two sections of chairlift installations with detachable grip, will be delivered as turnkey to ERZİNCAN Province. You can follow the technical data and the photos from references page.
REFERENCES
Aydın - Grup Gondol (2008)
The works for the aerial ropeway Aydin, which will be transport people between Pınarbasi and Aytepe, began in September 2008. The Ropeway will welcome its guests in the year 2009, with a daily capacity of 2000 person.
 
TECHNICAL FEATURES

Vertical Line lenght          -  542,49 meter  
Height Distance               -  87,55 meter
Speed                             -  0-3 m/sec (adjustable)
Capacity                         -  216 persons/hour
Cabins Quantity              -  6
Engine Power                 -  100 kw
Rope Diameter               -  41mm
Images [Total : 4 ]
Other References
» Erzincan Ergan Dağı Telesiyej Tesisi 2. Etap (2010)
» Erzincan Ergan Dağı Telesiyej Tesisi 1. Etap (2010)
» Kars Çamurlu T-Bar Teleski (2009)
» Kars Sarıkamış -Telesiyej Tesisi (2009)
» Aydın - Grup Gondol (2008)
» Muş - Teleski Tesisi (2008)
» Ankara - Keçiören ( 2007 )
» Bitlis - Tatvan ( 2006 )
» Isparta – Davraz ( 2006 )
» Azerbaycan – Balaken ( 2007 )
» Bursa Gondola ( 2004 )
» Bitlis Skilift ( 2005 )
» Samsun Group Gondola ( 2005 )
» Isparta – Davraz ( 2003 )
» Erzincan – Sakaltutan ( 2003 )
» İzmir – Ödemiş ( 2003 )
» Kastamonu – Büyük Ilgaz ( 1999 – 2002 )
» Erzurum – Palandöken ( 1995 – 1999 )
© 2007 STM Sistem Teleferik - Privacy Statement
Kemalpasa Ansizca Koyu Mevkii Organize Sanayi Bolgesi No :356 35170 Kemalpasa-IZMIR
Tel : +90 232 878 03 90 (pbx) Fax : + 90 232 878 03 89
info@stmteleferik.com.tr - www.stmteleferik.com.tr
SKC Yazılım ve Bilişim Teknolojisi